1) North Campus Extension Project

Project duration: 4 months

Year: 2009

Role: Design Consultant

Project involved:

  • Assessing in detail the supply capacity restrictions and future load projections on the campus
  • Designing in detail a new MV substation
  • Reconfiguring the MV network to allow for proposed future expansion

 

2) MV Substation Designs, Installation and Commissioning

New Engineering Building (NEB), Human Biology Building (HBB), Science & Research Building (SRB) & Life Course Building (LCB)

Project duration: 1-2 month

Year: 2010–2016

Role: Specialist MV Sub-contractor

Project involved:

  • Design and consultation on incorporating new MV substation to existing MV ring circuit with no outage requirement
  • Supply, installation and commissioning of transformer, switchgear c/w MV feeder protection relay and DC supply unit
  • Consultancy on altering MV network to incorporate new substation; Amtech Discrimination Study carried out
  • MV cable terminating and pressure testing
  • Date
    24/11/2015
    1) North Campus Extension Project Project duration: 4 months Year: 2009 Role: Design Consultant Project involved: Assessing in detail the supply capacity restrictions and future load […]
  • Date
    24/11/2015
    MV Upgrade Works   Project duration: 1 month Year: Sept 2011 Role: Specialist MV Sub-contractor Project involved: Removal of old oil-filled MV switchgear and replacement with […]
  • Date
    24/11/2015
    Client: Electrical Contracting Utility Project duration: 24 months Role: Project Management / Specialist Sub-Contractor We have acted as Project Managers and specialist Sub-Contractors on various large […]
  • Date
    24/11/2015
    Client: Various Project duration: n/a Role: Specialist We have provided comprehensive Health & Safety Training on HV and MV equipment and operation for various clients. We […]